Traffic Changes on SR 37 in Bloomington Begin Friday

BLOOMINGTON, Ind. (Dec. 14, 2017) – Motorists traveling between Bloomington and Martinsville on SR 37 will notice changes to traffic patterns and access points beginning on Friday, Dec. 15. The lane shifts and new access will allow crews to get SR 37 ready for a winter configuration that will have four lanes of traffic moving both north and south bound in most of the corridor.

On Friday, northbound traffic on SR 37 between the Sample Road interchange and Crossover Road will be shifted onto the new I-69 northbound travel lanes.  Access on and off this stretch of the northbound roadway will be limited to East Sample/Wayport Road.  When northbound traffic moves to new I-69 pavement, the current SR 37 northbound lanes will become a bidirectional access road for homes and businesses east of SR 37.

Southbound motorists get to the new access road by turning left off of SR 37 at East Sample/Wayport; northbound motorists get to the new access road by turning right at East Sample/Wayport.  Motorists traveling north on Wayport Road can get to the new access road by using the East Sample roundabout. Because the new access road is bidirectional, motorists are urged to use caution and turn signals when entering and exiting the roadway.

Direct access to the Mobile/Circle K gas station from SR 37 will be eliminated.  Customers will need to go south on the East Sample/Wayport access road to reach the service station and Nature’s Way.  Bloomington Auto Parts, Worm’s Way, Inc., Oliver Winery, Fox Hollow Road, the Family Life Worship Center and Parker Pools can be accessed by traveling north on the new access road (old SR 37 northbound lanes) from East Sample/Wayport.

U-turns at the northern and southern ends of the new northbound travel lanes will be located at Crossover Road and the East Sample/Wayport access road just north of the Sample Road overpass. Northbound motorists needing access to the west side of the highway will need to make a U-turn at Crossover Road and proceed southbound to Lee Paul Road.

In addition, on Monday, Dec. 18, southbound traffic entering the northern limits of the construction zone at Indian Creek will be placed on new I-69 pavement, separating it from northbound traffic that will remain on the current SR 37 northbound lanes.  Both north and south bound traffic will remain in single lanes, allowing crews to continue with patching, paving and maintenance operations as long as the weather permits.

INDOT reminds all motorists that work will continue at various points in the construction zone throughout the winter, and the posted speed limit remains 45 mph.  Motorists are urged to be aware of the new lane configurations and changes in traffic patterns, and to always drive safely and for the conditions.

About Brian Scott

I play on the radio from 7 am -1 pm weekdays on 98.9 WYRZ and WYRZ.org. Follow me on twitter @WYRZBrianScott or e-mail me at brian@wyrz.org.

Check Also

Grand Opening for Virgil Park in Brownsburg Set for May 1

The Town of Brownsburg is thrilled to announce the grand opening of Virgil Park, located …

Leave a Reply

Your email address will not be published. Required fields are marked *