MARION/HAMILTON COUNTY, Ind. – INDOT is replacing the Ditch Road bridge over I-465.
Construction is scheduled to start Monday, March 4. The bridge is scheduled to be completely closed from March 4 to Sept. 30.
The bridge service life is up and a new bridge is required.
Crews will be replacing the bridge and adding sidewalks on either side.
While the bridge is closed, drivers can use the posted detour. They can take Ditch Rd. to 86th St., turn left on Springmill Rd. then turn left on 96th St.
Crews will also be working on I-465 in the area. No major closures are expected at this time.
INDOT wants to remind drivers to slow down and give our crews room to work in construction areas.
Stay informed
Follow @INDOTEast on Twitter, Facebook and Instagram.
Subscribe to receive text and email alerts about INDOT projects and services at alerts.indot.in.gov.
Learn about highway work zones and other traffic alerts at indot.carsprogram.org, 1-800-261-ROAD (7623) or 511 from a mobile phone.