Restrictions on State Road 75 starting on or after August 21 for ongoing bridge work near Jamestown

HENDRICKS COUNTY, Ind. – The Indiana Department of Transportation announces restrictions on State Road 75 starting on or after Monday, August 21 for bridge work near Jamestown. Traffic will be down to one lane over West Fork Big Walnut Creek and controlled by temporary traffic signals. The restrictions will be between W. County Road 1025 N. and W. Co. Rd. 900 N. through mid-September, weather permitting.

This contract was awarded to Rieth Riley Construction for $7.2 million. Crews will be performing a bridge deck overlay on S.R. 75 over Branch Ramp Run, an HMA Overlay between S.R. 234 and U.S. 136, and preventative maintenance from U.S. 36 to S.R. 234. The entire contract is expected to be completed in June of 2024.

INDOT urges motorists to slow down, use caution, and consider worker safety when traveling through a work zone.

 sr 75 jamestown

About Brian Scott

I play on the radio from 7 am -1 pm weekdays on 98.9 WYRZ and WYRZ.org. Follow me on twitter @WYRZBrianScott or e-mail me at brian@wyrz.org.

Check Also

Town of Plainfield, Hendricks Regional Health and Mr. James Wheeler Announce Preservation of Historic Little House

PLAINFIELD, Ind. – In a significant victory for historic preservation, Hendricks Regional Health, the Town …

Leave a Reply

Your email address will not be published. Required fields are marked *